Installation
1–24 975-0639-01-01 Rev A
This guide for use by qualified personnel only
Installing the DC Switchgear next to Conext SW Inverter/Charger
WARNING
FIRE HAZARD
Make sure the supplied nuts on the inverter/charger are tightened to a
torque of 10–11 ft-lbs (13.5–14.9 Nm). Torque all other connections to the
manufacturer’s specifications.
Make sure the bus bar, washer, and nut are assembled in the order shown
in Figure 1-12 on page 1–25..
Failure to follow these instructions can result in death or serious injury.